Friday, January 16, 2009
ss boom hardware
316 stainless stick and pipe drops from the shipyard make good fittings for the spar. notice the the cleat on the aft end for the main outhaul.
strip planking
western red cedar makes a good composite "sandwich meat" with epoxy and fiberglass cloth. it is a slow process but it looks great and is pretty strong. 6 oz. e-glass wets out clear with a glue like system three or west systems resin.
Sunday, January 4, 2009
Saturday, January 3, 2009
Subscribe to:
Posts (Atom)